Status of Gap Detectors

Video Conference on August 19th, 1996

Discussion Items:

  1. Status of gap dimensions.
  2. Schedule for freezing gap detector (ITC) design.
  3. Plans for MC simulation of final (?) design.
  4. Maximum space available inside drawers for ITC PMTS.
  5. Routing of calibration tubes through the ITC.
  6. Space constraints on EC scintillators.
  7. Space constraints on new extension between cryostats.
  8. Design and fiber routing of ITC.
  9. Plans to include ITC in Extended Barrel Module 0.
  10. Possibility of testing the 2 ExB Module 0's side-by-side with ITC between them at 1997 Test Beam.


** Gap Drawings